Car Wash Distribution Board

We recently undertook a project for behalf of one of the oil majors in Somerset to create a distribution board for a new car washing facility. As experts in the field and having already designed … [Read more...]

400v Rebbox under construction

Our picture shows the latest Rebbox power distribution unit being wired in the workshop... The Client - SIMS Ltd. are contracted to deliver capacity improvement on the East London Line... they have … [Read more...]

Network Rail Approval for Class II Full and Half Loc Installations

We are delighted to have been given Network Rail approval for our Full and Half Loc SigBox Class II FSP Switchgear Assembly. Click here or the image for the full Network Rail approval … [Read more...]

Petrol Forcourt Electrical Control Panel

Control Systems and Equipment has recently delivered a new electrical control panel to one of the major oil retailers in the UK to a substantial new redeveloped outlet in Hampshire. The new site … [Read more...]

Half Loc SIG Box Approved

We are delighted to announce that Network Rail have approved* our SIG 50 and SIG 52 Class II switch boxes to go into the 1/2 size location case. The new boxes are the same NRLP27409 … [Read more...]

Stainless Steel Isolators for Unipart Rail

Production of CSErail's UI80 stainless steel 80amp Isolator has been stepped up recently to cope with increased demand from Network Rail contractors. Today's batch is destined for installation within … [Read more...]

Efficient Panel Wiring

The image below shows the latest example of Control Systems’ din rail-mounted panel wiring system which has been developed and refined over several years into an efficient and cost-effective solution … [Read more...]

Second 1/2 MW Solar Control Panel Delivered

Development continues at a fast pace as we position ourselves to be a key player in the industrial renewable market. Last month, we cut out teeth on a fairly small solar control panel. Now we are … [Read more...]

Car Park Control Panel

Here we have an example of our abilty to manufacture to tight deadlines with limited information. Working from old photographs the engineering team designed, developed and manufactured these Car Park … [Read more...]

SIG 52 Developed

The SIG52 has been developed for specific projects where there is a need to power two transformers within a half location case.  The original SIG 50 design was modified by applying a reduction in … [Read more...]