400v Rebbox under construction

Our picture shows the latest Rebbox power distribution unit being wired in the workshop… The Client – SIMS Ltd. are contracted to deliver capacity improvement on the East London Line… they have requested 400v labelling and 3-phase wiring to match the power switching equipment found in another REB at that site. The contract consists of CSErail’s REB2 ref 51561/2 , mains incomer and two distribution modules with 2 additional 51560/1  distribution modules. The robust design and construction of the stainless steel modules make for a long-lasting solution which will not degrade over the lifespan of the REB.

WP_20140212_002